• Interim Report

    The aim of the interim report was to propose feasible solutions by using the 10 design criteria we have chosen as guideline. We established 4 core modules that must be used for the ANR hardship this included the total costing of 4 modules. Additionally, the advantages and disadvantages of analogue/digital approach is discussed in this report.


    Below is a link to download our Interim Report

    Download!