Summary
-
Since September 2001, he has secured number of grants as Principal Investigator (PI) as well as
Co-investigator (Co-I).
-
The total value of the grants raised as PI is about £9M with his share of £5M. As Co-I, his share is £2.3 M.
Grants
-
No.
Role
Project title
Value
Duration
-
35
PI
Cyber Resilient Micro Grid
€225k
2021-2023
-
34
Co-I
InnoCyPES
€606k
2021-2024
-
33
Co-I
RE-EMPOWERED: Renewable Energy EMPOWERing European and InDian communities
€562k
2021-2024
-
32
PI
MIDER: Monolithic integration of Renewable Energy Resources
€212k
2020-2022
-
31
PI
ROSES: Resilient Operation of Sustainable Energy Systems
£775k
2020-2023
-
30
PI
WinGrid
€606k
2019-2023
-
29
PI
Estimation in PV dominated power network for stability and control
£100k
2019-2020
-
28
PI
A Novel Hybrid Microgrid Control Framework Including Multi-Mode Large-scale EVs Integration
£500k
2018-2022
-
27
PI
PVCI: PV Control and Integration
€183k
2017-2019
-
26
PI
JUICE: Joint UK-India Clean Energy Centre
£1M
2016-2020
-
25
PI
State Estimation for Active Distribution Network
£25k
2015-2016
-
24
PI
STABLE-NET: Stability and Control of Power Networks with Energy Storage, UK-China Grid
Scale Storage
£1M
2014-2016
-
23
PI
Investigation of Sub-synchronous Interaction between Wind Turbine Generators and Series Capacitors
£60k
2014-2015
-
22
PI
Model Simplification of Wind Farm for Grid Interaction Study
£100k
2015-2017
-
21
PI
RESCUES: Reliable and Efficient System for Community Energy Solution, UK-India Smart Grid Programme
£980k
2014-2016
-
20
PI
ACCEPT: Advanced Communication and Control for the Prevention of Blackouts, UK-India Smart Grid programme
£310k
2014-2016
-
19
PI
PV2025 - Potential Costs and Benefits of Photovoltaics for UK-Infrastructure and Society
£308k
2013-2016
-
18
PI
Offshore HVDC grid development in the North Sea: a pre-study
£20k
2012
-
17
PI
State Estimation for Active Distribution Network
£102k
2011-2015
-
16
PI
Modeling and control of AC-DC System with Significant Generation from Wind
£45k
2010-2014
-
15
PI
Stability and Performance of Photovoltaics
£571k
2010-2013
-
14
Co-I
Using Real-time Measurements for Monitoring and Management of Power
Transmission Dynamics for the Smart Grid
£353k, share:£175k
2010-2014
-
13
Co-I
Power System Wide-area GPS Synchronized Monitoring with Phasor Measurements and Low-Frequency Oscillation Mitigation Analysis
€137k, share:€68.5k
2010-2011
-
12
Co-I
Control for Energy and Sustainability
£5.8M, share:€100k
2009-2014
-
11
PI
Smart and Flexible Control
£33k
2008-2011
-
10
PI
A Wide-Area System for Power Transmission Security Enhancement using a Process Systems Approach
£272k
2007-2010
-
9
PI
Risk Assessment of Distribution Systems for Operational Purposes
£450k, share:£270k
2007-2009
-
8
PI
SUPERGEN FLEXNET
£6.38M, share: £330k
2019-2023
-
7
PI
Feasibility of Risk Assessment in EDF Network
£48k
2006-2006
-
6
PI
State Estimation in Distribution Network: Methodology and Implementation
£400k, share:£240k
2006-2009
-
5
PI
Measurement based FACTS control in power systems
$300k
2004-2006
-
4
Co-I
Supergen: Future Network Technologies for Sustainable Energy Generation
£520K, share:£200k
2004-2006
-
3
PI
Robust Damping of Oscillations in Large Power Grid Through FACTS Controllers Employing Global Signals
£123k
2002-2005
-
2
Co-I
Single and Multiple UPFCs as Aids to the Improvement of Supergrid Dynamic and Transient Performance
£104k
2002-2005
-
1
Co-I
Single and Multiple UPFCs as Aids to the Improvement of Supergrid Dynamic and Transient Performance
£238k
2002-2004
Industry funded consulting
-
No.
Project title
Duration
-
9
Stability criteria and specifications of power electronics interfaces for power network operation
2020-2021
-
8
Technical Methodology and Tool Development to Support Clean Development Mechanism (CDM), United Nations Framework on Climate Change
2017-2017
-
7
Small Scale Energy Storage (SSES)
2016-2017
-
6
Wind farm Dynamic Equivalencing
2016-2019
-
5
Aggregated Wind Farm Dynamic Interconnection Model and Analysis Involving Type-IV Turbines
2015-2016
-
4
Technical Investigation of Sub-synchronous Interaction between Wind Turbine Generators and Series Capacitors
2014-2015
-
3
Aggregated Wind Farm Dynamic Interconnection Model and Analysis Involving Type-III Turbines
2014-2015
-
2
Investigation of Synchronisation Problem of Offshore Wind Farm with the Grid
2013-2014
-
1
North Sea Power Grid Vision for Norwegian Power Grid Operator
2012-2012